
Architectural Consultancy :
Renovations (terrace):
13-20% of total construction costs with a minimum of RM 80,000.00 base fees
Renovations (Semi-D / Bungalow):
13-20% of total construction costs with a minimum of RM 120,000.00 base fees
New Build :
13-20% of total construction costs with a minimum of RM 180,000.00 base fees
Interior Design Consultancy :
Apartments:
13-20% of total construction costs with a minimum of RM 40,000.00 base fees
Individual Houses :
13-20% of total construction costs with a minimum of RM 80,000.00 base fees
F&B (within mall) :
13-20% of total construction costs with a minimum of RM 50,000.00 base fees
F&B (normal shoplot w/out Management office) :
13-20% of total construction costs with a minimum of RM 40,000.00 base fees
*T&C Applies